Kitchen Remodel Cost Calculator
Kitchen remodels are priced by size and finish level. Enter your kitchen's square footage and choose a finish level to estimate the total.
Most homeowners pay $23,000 to $44,250 for 150 sq ft, midrange.
Your estimate
- Materials and labor
- Add-ons
- Permits and design
National installed prices, materials and labor included. Your local quotes may differ.
Kitchen remodel cost by option
Installed totals (based on 150 sq ft), with standard conditions and permits and design included.
| Option | Typical total |
|---|---|
| Minor or cosmetic | $11,750 to $25,500 |
| Midrange | $23,000 to $44,250 |
| Upscale | $41,750 to $78,000 |
Installed price per unit
| Option | Installed price |
|---|---|
| Minor or cosmetic | $75.00 to $150 per sq ft |
| Midrange | $150 to $275 per sq ft |
| Upscale | $275 to $500 per sq ft |
What drives the price
- Finish levelCabinets and countertops are the largest line items, and moving from stock to custom changes the total the most.
- Layout changesMoving sinks, gas lines or walls adds plumbing, electrical and structural work.
- AppliancesAppliance packages range from basic to professional grade and are often bought separately.
- Hidden conditionsOld wiring, plumbing or water damage behind walls can add cost once demolition starts.
How this estimate works
The calculator multiplies your kitchen size by the installed price range for the option you pick, adjusts it for the conditions you set, then adds any extras you tick and typical permits and design. The headline number is the midpoint of your range. Low-end prices fit simple jobs in lower-cost areas. High-end prices fit complex jobs, premium brands and high-cost metros.
Get at least three written quotes before you hire. Ask each contractor to list materials, labor, permits and disposal separately so you can compare them line by line. Read how we build our ranges.
Common questions
How long does a kitchen remodel take?
A midrange remodel commonly takes 6 to 12 weeks of construction, plus design and ordering time.
Where should I spend on a kitchen?
Many homeowners put money into cabinets, countertops and layout, since they are hardest to change later.
How much contingency should I plan?
Many remodelers suggest setting aside 10 to 20 percent for surprises.
Sources and method
Price ranges are national installed estimates maintained by the HouseMath editorial team and last reviewed September 2026. For the labor side of the job, see the U.S. Bureau of Labor Statistics Occupational Employment and Wage Statistics data for carpenters (SOC 47-2031), which shows how trade wages differ by state.